Project Description
Tasu Construction collaborated closely on the design and successfully completed the modular installation for this temporary shelter in Abbotsford, BC. This thoughtfully planned project is designed to provide a safe, welcoming space for individuals at risk of or experiencing homelessness, offering stability and support when it’s needed most.
This modular shelter can accommodate up to 50 individuals and includes a range of amenities that foster comfort, connection, and well-being. Inside, residents have access to a communal kitchen and dining area, a comfortable lounge, laundry facilities, and a dedicated medical room to support essential health services. Outdoor features such as secure storage and gardens further enhance the space while creating a sense of community and security.
For this project, Tasu provided:
- Design, Engineering & Permitting
- Project Management
- Transportation & Logistics
- Civil, Site Preparation & Grading Works
- Modular Installation
- Exterior Landscaping
- Utilities & Support Systems (Plumbing, HVAC and Electrical)
- Modular Installation
- Exterior Landscaping
- Utilities & Support Systems (Plumbing, HVAC and Electrical)
Location:
Abbotsford, BC
Completion:
June 2024
Size:
50 Beds
Construction Duration:
6 Months