Project Description

Tasu Construction collaborated closely on the design and successfully completed the modular installation for this temporary shelter in Abbotsford, BC. This thoughtfully planned project is designed to provide a safe, welcoming space for individuals at risk of or experiencing homelessness, offering stability and support when it’s needed most.

This modular shelter can accommodate up to 50 individuals and includes a range of amenities that foster comfort, connection, and well-being. Inside, residents have access to a communal kitchen and dining area, a comfortable lounge, laundry facilities, and a dedicated medical room to support essential health services. Outdoor features such as secure storage and gardens further enhance the space while creating a sense of community and security.

For this project, Tasu provided:

  • Design, Engineering & Permitting
  • Project Management
  • Transportation & Logistics
  • Civil, Site Preparation & Grading Works
  • Modular Installation
  • Exterior Landscaping
  • Utilities & Support Systems (Plumbing, HVAC and Electrical)

 

  • Modular Installation
  • Exterior Landscaping
  • Utilities & Support Systems (Plumbing, HVAC and Electrical)

Location: 

Abbotsford, BC

Completion:

June 2024

Size:

50 Beds

Construction Duration:

6 Months

Completion Photo #2-1
20240402_155508
Completion Photo #1 jpg