Project Description
Tasu Construction completed the construction of a 76-room Executive Camp to support a large-scale mining and exploration project in a remote area 450km North of Terrace, BC.
The project design included two 38-room dorms, a four-unit boot room entryway, and a six-unit Kitchen Diner, all connected by arctic corridors and covered by a full-span snow roof. Utilities supplied to the site included all off-grid electrical, gas, septic, and potable water systems.
The modular units sourced for the project were of superior quality and cost-efficient, meeting all levels of industrial workforce accommodation standards. The project was completed on time to meet occupancy and budget targets.
INDUSTRY: Mining & Exploration
Location: 450KM North of Terrace, BC
Completion: September 2020
Capacity: 76 Beds
Size: 46,000 SQ FT
Term: 2 Years
Duration: 90 Days
- Design & Engineering
- Project Management
- Transportation & Logistics
- Modular Housing Installation
- Utilities & Support Systems
- Equipment Sales & Leasing
- Camp Services